Step
In this section, the three
greenhouse walls are
joined together and the
roof added. This phase is
best undertaken by two
people.
Fit the profile end caps to
the roof and upright bars
before assembly.
Step
Bolt the bottom side and
front bars to the inside of
the corner post.
Step
Bolt the gutter side bar
to the inside of the
corner sections.
Step
Bolt the ridge bar to the
underside of the end roof
edge bars (C4) as shown.
Step
Bolt the roof glazing bars
to the ridge and gutter
bars, remembering to
insert two bolts into each
channel for the vent and
braces to be fitted.
D Greenhouse Assembly
& Roof Section
Pictures viewed from inside the Greenhouse except where stated
Outside view
D1
C4
1
3
&
2
4
4
5
1
2
3
4
5
1 3
&
5
Profile Code Qty
C4-3/C4-4 1
D2 1
D3-1 2
D4 2
G3 4
M610
Used for all sections so
quantity not listed in this
or other parts lists.
Add braces (D4) to the mid
points of the roof bars using
the bolts already inserted
and holes in the roof edge
beams.
D3
D4
Lift the frame onto the prepared
base and fix loosely. Check that
the frame is square and sits
nicely on the base before
tightening all nuts. Mark and
drill wall holes in line with the
fixing holes in the ridge bar and
the wall uprights. Plug and screw
firmly into place.