Gardman Lean-to Greenhouse User Manual Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
Step
Bolt the vent side bars
loosely to the vent top bar
as shown.
Note: Assembly is different
for polycarbonate and glass -
see illustration.
Step
Fit nuts and bolts to the
bottom ends of the vent
sides but do not tighten.
Slide the glazing sheet into
place.
Add the vent bottom bar.
Check that the vent is
square and tighten all nuts.
Slide completed vent along
the ridge bar until in
position.
Bolt the vent mounting bar
(F1) onto the roof bars
using the bolts previously
inserted (section D, step 5).
Adjust to butt up to the
vent and tighten.
Screw vent stay to vent
bottom bar using the pre-
drilled holes.
Screw the vent stay catches
to the vent mounting bar
using the pre-drilled holes.
FGreenhouse Vent Assembly
& Roof Completion
F2
F3
F4
F4
Pictures viewed from inside the Greenhouse except where stated
Notes:
• The assembly is slightly different for glass and
polycarbonate glazing.
• Glazing sheets are from separate glazing packs.
Glass
D1
F1
D3
F3
F10
F12
1
2
1
2
1
Poly
Outside view
Outside view
2
Profile Code Qty
F1 1
F2 1
F3 1
F4 2
F10 1
F12 2
66 6
M610
Used for all sections so
quantity not listed in this
or other parts lists.
F1
08835.rev6 11/4/06 3:26 pm Page 11
Page view 10
1 2 ... 6 7 8 9 10 11 12

Comments to this Manuals

No comments