Lean-to GreenhouseAssembly InstructionsLean-to GreenhouseAssembly InstructionsFor6ft x 4ft (1.93m x 1.27m)Lean-to model08835.rev6 11/4/06 3:26 pm P
StepPush the plastic door basesliders into the door bottombar as shown.Screw through the uprights intothe bottom bar and the slider.StepScrew through
StepBolt the vent side barsloosely to the vent top baras shown.Note: Assembly is differentfor polycarbonate and glass -see illustration.StepFit nuts a
A20 Gutter End CapGlazing & FinishingAccessoriesNOTE: Glazing instructions are included in the glazing pack.You can enhance your greenhouse with a
FramesProfile Description Qty CodeSide - Lower Horizontals (6ft) 1 A1-6Side - Upper Horizontals (6ft) 1 A2-6(Gutter Bar)Side Glazing Uprights 2 A3Side
Profile Description Size (mm) Qty CodeCorner Plates 2 G2Door Runner Support Brackets 15 2 E9Profile End Caps 4 G3Door Screws No 6 x 19 14 619Door Bott
IntroductionSafetyPrecautions when assembling a Gardman greenhouse:The wearing of protective gloves and stout footwear is essential when handling glas
Before you start:IMPORTANT: Read the instructions completely before starting assembly.• Construct the base first so that the greenhouse can be securel
A Greenhouse SideA3A2A1G1IntroductionLay parts on the ground, as pictured at thetop of this page.Assemble loosely with the nuts to theinside of the st
This section is thesame for both endsuntil the doorfitments are added.See section C.Lay the parts on theground as pictured andassemble loosely. Checkt
StepInsert bolts from theoutside through the doorframe top bar andthrough the support clips(E9) and attach nutloosely. Hook supportclips into groove i
StepIn this section, the threegreenhouse walls arejoined together and theroof added. This phase isbest undertaken by twopeople.Fit the profile end cap
Comments to this Manuals